Subfloor preparationDubai and UAE

Floor levelling in Dubai before carpet tiles, LVT and SPC, from the team that supplies and installs them

Screed checks, repairs and self-levelling, so the finished floor lies flat and the joints hold.

  • In-house installation team
  • Site visits and measurement
  • Free specification consultation

Self-levelling and inspection before the finish goes down.

Subfloors prepared
100+
Measurement and quantification
Site visits
Carpet tiles, LVT, SPC and vinyl
4 floor types
Moisture meter reading on a concrete screed

Why floor levelling in Dubai decides how long the finished floor lasts

Thin floors show what is under them. A ridge in the screed shows through vinyl sheet as a line, a dip lets an LVT or SPC click joint flex until it opens, and a dusty or damp screed stops carpet tile tackifier from bonding.

Dubai adds its own conditions. New screeds are often laid late in the programme and closed in before they dry, and air conditioning switched on near handover pulls the last moisture out fast. Older towers being refitted can have uneven slabs, old adhesive and tiles that are no longer bonded.

As a contract flooring supplier in Dubai, we offer self-levelling alongside supply and installation by our in-house team, so the base and the finish can be one job.

What a subfloor check covers before carpet tiles, LVT, SPC or vinyl

These checks start at the site survey and take-off, when the areas are measured.

  1. Flatness

    High spots, dips and steps, measured with a straightedge across the floor.
  2. Moisture

    Whether the screed is dry enough for the floor and adhesive chosen.
  3. Strength and surface

    Cracks, hollow areas, dust and laitance that would stop adhesive bonding.
  4. Old finishes

    Existing tiles, adhesive residue or paint that must be fixed, removed or primed.
  5. Levels and thresholds

    Height changes to doors, lifts, other finishes and raised access floors.

Self-levelling screed and repairs for commercial subfloors in the UAE

Problem foundUsual fix
Uneven screed, dips or stepsPrime, then pour self-levelling compound to a smooth, flat surface
Cracks and hollow areasRepair before levelling so they do not show through
Dust, laitance or old adhesiveGrind or scrape back, then prime
Existing ceramic tilesFix loose tiles; fill grout lines or level over them for glue-down floors
Damp screedLet it dry, or use a moisture barrier where the floor maker allows

Drying time before the floor goes down comes from the compound's datasheet and a moisture reading on site. No fixed figure is given here.

Subfloor tolerances for carpet tiles, LVT, SPC and vinyl, as typically specified

FloorWhat the base needs (typical)Notes
Carpet tilesFlat, dry and clean; small flaws are forgiven by the pileTackifier needs a dust-free, primed surface
Click LVT and SPCFlat to about 3 mm over 2 mDips flex the click joint; the floor's datasheet sets the final limit
Glue-down LVT and vinyl sheetSmooth and flatter than for click floors, about 2 mm over 2 mEvery ridge shows through thin vinyl
Engineered woodFlat and dry; boards acclimatise on site firstGlued boards need a sound, primed screed
RubberFlat and dryThick gym tiles hide small flaws; thin sheet does not

Thin glued floors are the least forgiving, which is why levelling matters most before homogeneous vinyl flooring and glue-down LVT tiles. Wood behaves differently again: engineered wood flooring also needs a dry screed, because timber takes up moisture.

How subfloor preparation fits the flooring installation timeline

Levelling and drying come before the floor, so they belong in the programme from the start. Book the subfloor check with the site measurement, and the levelling can be planned before the floor arrives. Our vinyl flooring installation and other installs follow once the base is ready. For typical durations, see our flooring installation timeline guide.

Floor levelling questions from Dubai fit-out teams

Do I need self-levelling before installing LVT or vinyl?

Only if the screed is uneven. Thin glue-down LVT and vinyl sheet show every ridge, so they need a smoother base than carpet tiles. A straightedge check on site tells you.

Can SPC go over existing floor tiles?

Yes, if the tiles are flat, sound and well bonded. Deep grout lines or loose tiles must be fixed first.

How is screed moisture tested?

With a moisture meter or a hygrometer reading taken on the screed. The reading is compared with the limit the floor and adhesive makers set.

How long after levelling can the floor go down?

It depends on the compound, its thickness and the site conditions. The compound's datasheet and a moisture reading decide it.

Who does the floor levelling, the fit-out contractor or the flooring supplier?

Either can. We offer self-levelling as part of our supply and installation, so the base and the finish sit with one company. The quote sets the scope.

Can raised access floors be levelled?

Raised access floor panels are set level by the access floor installer. Carpet tiles then go on the panels, lined up with the panel grid as your consultant specifies.

Laser measure on an empty office floor

Book a subfloor check with your flooring site visit in Dubai

Tell us the floor you plan to lay and the state of the screed, so the visit covers measurement and any levelling can be priced with the floor.